LogoLogo
  • 2025 REV ION FRC Starter Bot
  • REEFSCAPE 2025
    • 2025 Starter Bot Walkthrough
    • 2025 REV ION Starter Bot Build Guide
      • Cut List
  • CRESCENDO 2024
    • 2024 REV ION FRC Starter Bot
    • 2024 REV ION Starter Bot Build Guide
    • MAXSwerve Drivetrain for 2024 Starter Bot
    • West Coast Drivetrain for 2024 Starter Bot
    • Example Code
  • Charged Up 2023
    • Starter Bot - 2023 REV ION FRC
      • 2023 REV ION FRC Starter Bot Build Guide
      • 2023 REV ION FRC West Coast Drivetrain Build Guide
    • Game Breakdown
    • Game Elements
    • Drivetrains
Powered by GitBook
On this page
  • Cut List
  • Staying on Pitch

Was this helpful?

Export as PDF
  1. REEFSCAPE 2025
  2. 2025 REV ION Starter Bot Build Guide

Cut List

Previous2025 REV ION Starter Bot Build GuideNext2024 REV ION FRC Starter Bot

Last updated 3 months ago

Was this helpful?

Cut List

Type of Extrusion Stock
Length & QTY
  • 1.75in (x2)

  • 12.5in

  • 16.75in

  • 18in

  • 12.5in

  • 35.5in (x2)

  • 1.125in

  • 12.25in

  • 14.4375in

  • 17.75in

  • 2in

  • 5.5in (x2)

  • 12.5in

  • 17in

  • 35.5in (x2)

  • and cuts for MAXSwerve Drivetrain

  • 4in

  • 9.5in

  • 26.5in (x2)

  • 32.5in (x2)

Staying on Pitch

Every piece of structural tubing needs to start with a hole 1/2in (or slightly less) from the end where the length measurement is started.

1/2in Rounded Hex Shaft ()

MAXTube - 2x1 - Light ()

MAXSpline Shaft ()

MAXTube - 2x1 with Grid Pattern ()

MAXTube - 1/2x1/2 ()

REV-21-1135
REV-21-2161
REV-21-2520
REV-21-2590
REV-21-3289
Example Cut Images
All 1 inch sides of MAXTube extrusion feature #10 clearance holes spaced on a 1/2 inch pitch. Plan all cuts using a side with a 1/2 in pitch. On ONE end of each piece of structural tubing, there must be one complete hole within .25-.50 inches of the end.