LogoLogo
  • REV DUO
  • Structure
    • Introduction to Structure
      • 15mm Extrusion
      • 15mm x 30mm Extrusion
      • 15mm x 45mm C Channel
      • 45mm x 45mm U Channel
      • Flat Plate
      • Flat Beam
      • L Beam
    • Brackets
    • Corrugated Plastic Sheets
    • M3 Hardware
  • Motion
    • Introduction to Motion
      • Hex Shaft and Spacers
      • Bearings
    • Sprockets and Chain
      • Advanced Sprockets and Chain
      • Chain Tool
    • Timing Belts and Pulleys
    • Gears
      • Advanced Gears
    • Wheels
    • Linear Motion
    • Choosing an Actuator
    • Motors
      • HD Hex Motor
        • Pinion Pressing Guide
        • Pinion Removal Guide
      • Core Hex Motor
    • Servos
      • Smart Robot Servo
  • Building Techniques
    • Tips and Tricks for Building
    • Supporting Motion
    • Constraining Motion
    • Compatibility
  • Build Guides
  • Linear Motion Kit
    • Three Stage Cascading Lift
    • Three Stage Continuous Lift
  • Channel Drivetrain
    • Single Sprocket Shaft Assembly
    • Double Sprocket Shaft Assembly
    • Drive Shaft Assembly
    • UltraPlanetary Gearbox Assembly
    • Making the Chain Links
    • Drive Rail Assembly
    • Final Assembly
  • Channel Drivetrain - Mecanum Upgrade
    • 90mm Single Sprocket Shaft Assembly
    • 75mm Single Sprocket Shaft Assembly
    • Drive Shaft Assembly
    • UltraPlanetary Gearbox Assembly
    • Making the Chain Links
    • Drive Rail Assembly
    • Final Assembly
    • Mecanum Wheel Setup and Behaviour
  • Mecanum Drivetrain V2
    • UltraPlanetary Gearbox Assembly
    • Drive Rail Assembly
    • Final Assembly
    • Mecanum Wheel Setup and Behavior
    • Mecanum Drivetrain Example Code
  • Mecanum Drivetrain Kit
    • UltraPlanetary Gearbox Assembly
    • Drive Rail Assembly
    • Final Assembly
    • Mecanum Wheel Setup and Behavior
    • Mecanum Drivetrain Example Code
  • Extrusion Chain Drivetrain
    • Pre-Loading Brackets
    • Traction Wheel Assembly
    • Omni Wheel Assembly
    • UltraPlanetary Gearbox Assembly
    • Internal Chassis Frame Assembly
    • Making the Chain Links
    • Final Assembly
  • Extrusion Gear Drivetrain
    • Pre-Loading Brackets
    • Omni Wheel Assembly
    • Middle Grip Wheel Assembly
    • Front Grip Wheel Assembly
    • Gear Idler Assembly
    • UltraPlanetary Gearbox Assembly
    • Internal Chassis Frame Assembly
    • Final Assembly
  • Class Bot V2
    • Pre-Loading Brackets
    • Internal Robot Frame Assembly
    • External Robot Frame Assembly
    • Wheel Assemblies
    • Arm Gear Assemblies
    • Arm Assemblies
    • Final Assembly
  • Class Bot
    • Pre-Loading Brackets
    • Internal Robot Frame Assembly
    • External Robot Frame Assembly
    • Wheel Assemblies
    • Arm Gear Assemblies
    • Arm Assemblies
    • Final Assembly
  • Electronics and Communication
    • REV Control System
    • Sensors
Powered by GitBook
On this page
  • Bracket Pre-Loading Parts Required
  • Pre-Loading Lap Corner Bracket Steps
  • Pre-Loading Insider Corner Bracket Steps
  • Pre-Loading Bearing Pillow Block Steps
  • Pre-Loading Indexable Motion Bracket Steps
  • Pre-Loading UltraPlanetary Flat Mounting Bracket Steps
  • Pre-Loading UltraPlanetary Bent Mounting Bracket Steps

Was this helpful?

Export as PDF
  1. Extrusion Gear Drivetrain

Pre-Loading Brackets

PreviousExtrusion Gear DrivetrainNextOmni Wheel Assembly

Last updated 3 years ago

Was this helpful?

Bracket Pre-Loading Parts Required

PART NUMBER

DESCRIPTION

QTY.

15MM BEARING PILLOW BLOCK

16

15MM PLASTIC LAP CORNER BRACKET

16

15MM PLASTIC INSIDE CORNER BRACKET

8

15MM PLASTIC INDEXABLE MOTION BRACKET

4

ULTRAPLANETARY BENT MOUNTING BRACKET

2

ULTRAPLANETARY FLAT MOUNTING BRACKET

2

M3 X 8MM HEX CAP SCREWS

128

M3 NYLOC NUTS

128

Pre-Loading Lap Corner Bracket Steps

The side of the bracket with “” must have the Hex Cap Screw head.

Take a bracket and finger start one Hex Cap Screw and Nyloc Nut per hole.

PRE-LOADED BRACKET COMPELTE

Repeat this step until you have sixteen Pre-Loaded Brackets.

Pre-Loading Insider Corner Bracket Steps

The side of the bracket with “” must have the Hex Cap Screw head.

Take a bracket and finger start one Hex Cap Screw and Nyloc Nut per hole.

PRE-LOADED BRACKET COMPELTE

Repeat this step until you have eight Pre-Loaded Brackets.

Pre-Loading Bearing Pillow Block Steps

Take a bracket and finger start one Hex Cap Screw and Nyloc Nut per hole.

PRE-LOADED BRACKET COMPELTE

Repeat this step until you have sixteen Pre-Loaded Brackets.

Pre-Loading Indexable Motion Bracket Steps

Take a bracket and finger start one Hex Cap Screw and Nyloc Nut per hole.

PRE-LOADED BRACKET COMPELTE

Repeat this step until you have four Pre-Loaded Brackets.

Pre-Loading UltraPlanetary Flat Mounting Bracket Steps

Take a bracket and finger start one Hex Cap Screw and Nyloc Nut per hole.

PRE-LOADED BRACKET COMPELTE

Repeat this step until you have two Pre-Loaded Brackets.

Pre-Loading UltraPlanetary Bent Mounting Bracket Steps

Take a bracket and finger start one Hex Cap Screw and Nyloc Nut per hole.

PRE-LOADED BRACKET COMPELTE

Repeat this step until you have two Pre-Loaded Brackets.

The side of the bracket with “” must have the Hex Cap Screw head.

The side of the bracket with “” must have the Hex Cap Screw head.

REV-41-1317
REV-41-1321
REV-41-1320
REV-41-1313
REV-41-1623
REV-41-1624
REV-41-1359
REV-41-1361
ribs
ribs
ribs
ribs