LogoLogo
  • REV ION Build System
  • FRC Robot Basics Guide
  • System Standards
  • Structure
    • Introduction to Structure
    • Brackets
      • MAXSpline Brackets
      • Structure Brackets
      • Actuator Brackets
    • MAX Pattern Plates
    • Hardware
    • Extrusion
    • Bumper Brackets
    • MAXComposite
  • Motion
    • Introduction to Motion
    • Shafts / Spacers / Collars
    • MAXHubs
    • Tubes / Bushings / Axles
    • Bearings / Bearing Blocks
    • Pivot Joints
    • Linear Actuators
    • Gears
      • Advanced Gears
    • Sprockets and Chain
      • Advanced Sprockets and Chain
      • Chain Tool
    • Belts and Pulleys
    • Ratio Plates
    • NEO Brushless Motors
    • Servos
      • Smart Robot Servo
    • Wheels
      • Traction
      • Grip
      • Omni
      • Compliant
      • Flap
    • Gearboxes
      • 2 Motor Gearbox - Through Bore
      • 2 Motor Drivetrain Gearbox - Through Bore
    • MAXPlanetary System
      • System Features
      • Mounting Features
      • Load Ratings
      • Assembly Tips and Tricks
    • MAXSwerve
      • MAXSwerve Build Guide
      • MAXSwerve Drivetrain Onshape
      • MAXSwerve Calibration
      • Wiring MAXSwerve
      • Programming MAXSwerve
      • MAXSwerve Wheel V1 Evaluation
      • MAXSwerve Module Inspection
      • Aluminum MAXSwerve Wheels
      • MAXSwerve Wheel Tread Reinforcement
  • Onshape Examples
    • Onshape CAD Examples
    • Low Complexity
    • Medium Complexity
    • High Complexity
  • Building Techniques
    • Supporting Motion
    • Constraining Motion
  • Build Guides
    • MAXSwerve Module Assembly
      • Motor Orientation
      • MAXSwerve SPARK MAX Mounting Bracket Assembly
      • MAXSwerve Pack Contents
      • MAXSwerve Assembly Tips
    • MAXSwerve Drivetrain Assembly
    • Elevator Bearing Block Assembly
    • MAXPlanetary Gearbox Assembly
      • NEO & CIM
      • NEO Vortex
      • NEO 550 & 550 Sized Motors
      • 775 Sized Motors
      • Falcon
      • Shaft Retention Assembly
      • Spacer Installation
    • MAX 90 Degree Gearbox Assembly
    • 2 Motor Drivetrain Gearbox Assembly
    • 2 Motor Gearbox Assembly
    • Linear Actuator Assembly
    • MAX 180 Degree Gearbox Assembly
    • Drivetrain Bumper Kit Assembly
      • West Coast Drivetrain with MAXTube
      • AM14U5 (FRC Kit of Parts Chassis)
    • REV ION West Coast Drivetrain Assembly
  • REV ION Control System
    • REV Hardware Client
    • Power Distribution Hub
    • Radio Power Module
    • Mini Power Module
    • Brushless Motors and Controllers
    • Pneumatics
    • Sensors & Indicators
Powered by GitBook
On this page

Was this helpful?

Export as PDF
  1. Build Guides
  2. MAXPlanetary Gearbox Assembly

775 Sized Motors

775pro or AM Redline

PreviousNEO 550 & 550 Sized MotorsNextFalcon

Last updated 3 months ago

Was this helpful?

775 Sized Motors Multi-Stage Assembly Instructions

For assembly you will need a 5/32" and 3mm Allen Wrench.

1) Press the adapter shaft onto the 775 motor shaft.

Note: Make sure the adapter shaft and motor shaft are perfectly aligned in order to prevent damage to the motor.

2) Place the spacer plate on the front of the motor.

3) Place the motor and spacer plate onto the MAXPlanetary input block.

4) Attach the motor to the input block with the 2 M4 screws.

5) Place the shaft key in the keyway in the adapter shaft.

6) Slide the input coupler all the way onto the adapter shaft.

If your robot requires shaft retention in the gearbox, follow the instructions now before proceeding.

When building your gearbox make sure the highest gear reduction is closest to the motor.

7) Place the appropriate gear cartridge on the 1/2" Hex Socket Output.

Note: The cartridge may need to be rotated to get the splines to line up. Once the splines are inserted continue to rotate the cartridge to ensure that the alignment features are completely engaged.

8) Continue stacking gear cartridges backwards towards the motor in the appropriate order.

Note: Ensure that the alignment features of each cartridge are properly engaged with the cartridges next to it.

9) Align the stacked output stage and gear cartridges with the input stage.

10a) Slide the stack of gear cartridges onto the motor shaft and input stage. Ensure that the input spline on the rear gear cartridge and the input coupler are properly engaged.

Note: This may require twisting the gear cartridges slightly to line up the splines and then rotating back once the spline is engaged. Make sure the entire stack is pressed together and all alignment features are properly engaged.

10b) Gap - Having a gap in this location is bad. If a gap is present, it means that all alignment features are not properly engaged. This may require twisting by hand the gear cartridges slightly to line up the splines and then rotating back once the spline is engaged. Make sure the stack is fully seated and no gap is present before inserting and tightening the gearbox assembly screws

11) Insert the appropriate length of 10-32 Socket Head Cap Screws into the gearbox assembly holes

0 Cartridges: 1/2in Long Screws

1 Cartridge: 1in Long Screws

2 Cartridges: 1-1/2in Long Screws

3 Cartridges: 2in Long Screws

12) Tighten the gearbox assembly screws down.

Note: It is a best practice to spin both screws all the way into the holes without tightening them and then alternate between tightening the two screws to snug them up.

Shaft Retention Assembly